Friday, 17 December 2010

Lewis Hards Post

As you can see under main production paperwork, we have added a shooting schedule with day one and day two. The date for shooting day one was Friday 10th December 2010. The second day of shooting was on Monday 13th December. We feel as a team we followed the schedule quite well. We did however not film a few shots as we as a team feel that this would make our final production far too long and would not fit inside the maximum time limit of two minutes.

No comments:

Post a Comment